
First Level
Before starting the bore work in particular area, we will undertake the entire survey of that particular area, type of sand, ground water source and quality of the water.

2nd Level - Forms of Rock Bedding
It is not always possible to measure the elements of the bedding of layers with the help of the surveyor's and diviners report alone.

3rd Level – Maintenance of Borewells
There are some areas which must undergone re-flushing after six months’ time.
First Level
Before starting the bore work in particular area, we will undertake the entire survey of that particular area, type of sand, ground water source and quality of the water.
Ground Survey:
When we start the survey work, we scrutinize the type of the sand and the type of the rock, and the water level. Especially, if saline water comes, we will distinguish the core composed of plastic rocks and the enclosing rocks surrounding it. Besides, we find a marked difference between the structure of the core and the enclosing rocks. The core bears all the features of the active dislocation of the plastic masses composing it in the upward direction, while the structure of the enclosing rocks reflects only their passive accommodation to the movement of the core The shapes of the core are characterized by a gentle arch and steep lateral surfaces. In the plan the contours of the core are not the same at different depths. The core of the fold, composed of the Devonian rock salt, in the Upper Cretaceous deposits is elongated in the north - west direction parallel to the strike of the Hercynian structures; in Paleogene deposits the core acquire the rounded contours.
The inner structure of the core is characterized by an exceptionally complicated arrangement. The plastic rocks composing the core are crumpled into narrow and compressed folds. Which can be formed only when the substances are in the state of flowing. Individual inter-layers composing these folds are greatly extended; in place however, they form complex bending, clusters, and irregular bulges. They enclose rock masses at the contact with the core are often fractured and truncated by the plastic rocks of the core. In the proximity of the contact, they have a steep form of bedding, often turned upside down or overturned. Numerous ruptures and gliding surfaces are developed within them along which individual members and riders become separated from the rocks that enclose them and follow the core in their dislocation over considerable distances. The said displacement is accompanied by the development of zones of fracture and fault breccias, which attribute to the structure of enclosing rocks in the contact zone complexity of a very high degree. These dislocations soon die out as the core becomes more remote - and at several hundred meters from the dislocated zone, they usually disappear altogether. Thus, in diaper structures two types of folds coexist: in the active core there is the development of the flow folds, whereas the rocks surrounding the core and subjected to transverse bending. Above all, the company finds out not only the type of the water, and the type of the rock and depth of ground water.
2nd Level - Forms of Rock Bedding
It is not always possible to measure the elements of the bedding of layers with the help of the surveyor's and diviners report alone. When the cores of boreholes and the walls of mining works are investigated, the measurement of the elements of bedding and water source becomes very often either totally impossible or can be accomplished only approximately.
Sketch of the Borewell (Or) Designing of the Borewell
After the soil test, the company starts the bore work according to the bore type. In this, they are inserting the slotter, only if the company is satisfied with the quality of the water, quantity of the water & the water level. The company is using the pebbles to filter the water from the fine sand also when required. To avoid the soil erosion, we use powerful bentonite powder.
The structure helps us to get success in our bore well work and also to get good and more water in all our sites. In rainy season, in Chennai we can get water least in 20 to 30 feet itself whereas on summer season we could not get water even in 120 feet, so the company doing borewell work according to the seasons & getting permanent solution for water problem in all over Tamil Nadu
In general, after the borewell work no one takes care of the bore till date. i.e., none of the borewell company takes care of the borewell point which leads to dissolving the bore point in future. whereas our company using top safe cup which avoids small insects to get inside the borewell. Also, there is a possibility of particles coming inside through the rainwater harvesting, also which leads to get destroy of the bore water. To face this problem, our company taking all the necessary steps and advising the parties to get rid of this type of problem in all the times Moreover, borewell also get destroyed by the food particles near the borewell, & the dirty water comes inside the bore through the toilet pipes and drainage pipes in rainy seasons. In this situation, our company advising the pros & consequences to all our parties.
3rd Level – Maintenance of Borewells
There are some areas which must undergone re-flushing after six months’ time. Particularly in sandy area when we insert the PVC pipe the holes of the slotter will be in 0.5mm to 1.5mm only. In rainy seasons, small sand particles might cover the slotter holes even after taking necessary steps like pebbles packing near the bore, which might lead to the low water level, and also the destroy the condition of motor and the pump set. In this case, our company is giving free service for 6 months to one year and undertakes short term and long-term services.